Clean Future

Bids For Setting Of Over 8000 MW Capacity of Wind Power Projects, Finalised

The Government has set a target of installing 60 GW of wind power capacity by 2022, against which 35 GW capacity has already been installed.

Currently the wind power projects in the country are installed on the basis of commercial viability through tariff based competitive bidding process.

As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India Ltd. (SECI) and National Thermal Power Corporation Ltd. (NTPC).

Besides, bids of 500 MW each have been finalised by the states of Tamil Nadu, Gujarat and Maharashtra.

The Government is promoting wind power projects in entire country by providing various fiscal and financial incentives such as Accelerated Depreciation benefit; concessional custom duty exemption on certain components of wind electric generators. Besides, Generation Based Incentive (GBI) is being provided to the wind projects commissioned before 31 March 2017.

In addition to fiscal and other incentives as stated above, following steps also have been taken to promote installation of wind capacity in the country:

This is a PIB News-Feed which was edited by Clean-Future Team

Exit mobile version